Search
Generic filters
Exact matches only

Planned Development

This topic contains 4 replies, has 1 voice, and was last updated by  davidck 4 months ago.

Planned Development

  • davidck
    Keymaster

    All planned development may be found here, along with with notices of maintenance periods.

    • This topic was modified 4 years ago by  davidck.
  • davidck
    Keymaster

    Testing an additional reply, should result in a conversation thread.

  • davidck
    Keymaster

    Major site structure in place, now a matter of adding content.

  • davidck
    Keymaster

    Site is opened to Staff testing today, with an expected influx of test users during the week.

    Key areas for testing:

    • Logging in on a variety of devices.
    • Checking the account verification process works; we have manual approval.
    • Expected appearance of flag checker for different ISPs.
    • The messaging system; both private and public.
    • Posting to forums.

    It is also expected that this is the time when extra groups will be made, and for new pictures to be added.

  • davidck
    Keymaster

    Currently dealing with a massive change to the theme system, which breaks things. Most areas are now working again, but some aspects need more work. There is still not a maintainer for adding new content to the site, so I’ll see about adding some material that is being prepared for the 50th anniversary of Glenfield College; most likely from the photos which are being scanned into Flickr right now.

You must be logged in to reply to this topic.

Skip to toolbar